K-Bridge

187248_mmkm_tfgy_2233_1_v.jpg Intended to be temporary, the structure of the Connecting Railway Bridge built after the war served Budapest until 2008 At the end of World War II, a permanent railway bridge over the Danube was rebuilt at record speed. One and a half years after the weapons were silenced in the country, and exactly 22 months after the bridge was blown up, the semi-permanent structure of the Connecting Railway Bridge was already standing, weighing half as much as the Chain Bridge which is much longer than this. Although it was demolished a few years later from its original location, it moved to Újpest, where it served traffic until recently.

More articles