BFK

2021. január 19. 09:00
Two bridges are being built as part of the Galvani Bridge development project. The cable-stayed structure spanning the main Danube branch has been discussed in detail but the other bridge planned to cross the Soroksár branch of the river has almost been forgotten, despite being a major and beautiful piece of infrastructure.
2020. október 2. 11:00
The bridge being built is the sixth structure to connect the tracks on the two sides of the Danube beside Rákóczi Bridge. However, the current construction is unique, as it is similar to threading a thread through a needle. See the photos of the unique procedure below.