bath

195176_kazincuy4048_2.jpg It was once a steam bath, now a hotel is being built on Kazinczy Street At 40-48 Kazinczy Street in the 7th District, the area on which a 270-room hotel with a two-story underground garage can now be built was created by combining five lots. As part of the works, a section of the street will also be renovated, and the buildings currently standing on the lots will be demolished, so it is expected that the former steel-and-glass block of the Hungarian Dance Academy and the historicising house at 48, known first as a meat factory and then as a nightclub, will also be torn down.
Witness of the Turkish Era - The renovation of the Király Bath is still pending One of the most emblematic surviving buildings of the Turkish era in Budapest, the Király Bath, which is still closed, has been awaiting renovation for some time. Renovation work has not yet begun, although a call for ideas was launched in 2017 and the best design was selected, but the actual conversion work will take some time. The building was last completely renovated in the 1950s. Since then, there have been more or less restoration works, but today we find the bath in a very bad condition, the history of which dates back to the time of the Turkish occupation.
Trees replanted in Csepel The replacement trees in the Csepel Open-Air Baths in underway. The aged, diseased willow trees are being cut down, but have been replaced beforehand. In recent years, Csepeli Városgazda Közhasznú Nonprofit Zrt. has planted forty trees and is planning further afforestation.

More articles