embankment
Frigyes Podmaniczky, who managed the development of Budapest, died 115 years ago
October 19, 2022 at 12:30 PM
He was one of the most important figures in the history of Budapest, who devoted all his energy to the development of the capital. Baron Frigyes Podmaniczky managed the Public Works Council for more than thirty years, essentially everything that we now consider Budapest's architectural and cultural heritage was built during his time. He played a decisive role not only in the development of the city but also in the theatre world. Perhaps the most popular person in Budapest, who worked for the city until his death, died 115 years ago.
Széchenyi István square and Clark Ádám square can be renewed
March 21, 2022 at 3:00 PM
The planning works related to the renovation and transformation of Széchenyi István square and Clark Ádám square may continue soon. At the Pest bridgehead of the Chain Bridge, the circularity of the square will be eliminated, while at the bridgehead of Buda, the square will be accessible to pedestrians and cyclists.
The pedestrian promenade on the lower embankment of Pest has been completed
December 13, 2021 at 2:30 PM
Reconstruction work has been completed, so the pedestrian promenade of the sr. József Antall embankment on the section between the Parliament and Margaret Bridge is open. The three-phase modernization of the banks of the Danube in Pest was started by the local council of Budapest in 2017 in order to improve the livability of the embankments.
Trees are planted on the lower embankment of Pest
November 26, 2021 at 1:00 PM
The lower embankment of Pest will be renewed, where a pedestrian promenade and a row of alleys will be developed. On 22 November, the planting of 34 oaks with a trunk height of three meters began between the Parliament and the Margaret Bridge.
Alteration of the embankments can begin next summer
August 26, 2021 at 7:00 PM
Representatives of BKK Centre for Budapest Transport and design companies have signed a contract, according to which they will prepare construction plans for the makeover of the inner city Danube Bank. The renovation can start next summer - according to the BKK website.
The longest monuments in Budapest: the history of the embankments
April 12, 2021 at 9:30 AM
Until the middle of the 19th century, anyone could walk down to the undeveloped, muddy banks of the Danube, but during a flood, nothing stood in the way of the water. The 12-kilometre-long embankments along Budapest's Danube Banks have become an essential part of the cityscape and protect the capital from floods. In connection with the freshly announced reconstruction of the Pest embankment, Pestbuda presents the history of these magnificent structures.
Pest Embankments revisited: Promenade planned from Kossuth Square to Bálna – Széchenyi Square to be redesigned
April 1, 2021 at 7:30 PM
An agreement detailing the renovation of the Pest Embankment has been signed by representatives of the Government and the capital. According to the plans, a new promenade and green areas will be created from Kossuth Lajos Square to the Bálna, the roundabout on Széchenyi Square will be removed, the tracks of tram line 2 and Közraktár Street will also be renewed.
Lower embankment to be renovated between Parliament and Margit Bridge
February 12, 2021 at 3:00 PM
The Budapest City council has begun the process of renovating the pest lower embankment between Margit Bridge and Kossuth Square. The public procurement tender published today on the EU website details that the work will be completed until 31 December 2021. The government will provide 787 million HUF in funding towards the project.
More articles
The Bridge Report, which brought a turning point in the history of Budapest
A travel report that changed the history of Pest and Buda, as well as Hungary. The little book contributed to the change of half a thousand years of legal customs and the implementation of an investment of unprecedented size and technical quality. This book was The Bridge Report [Hídjelentés in Hungarian].
Drama on the university wall - The heroic monument was planned 95 years ago
In the constant hustle and bustle of the Egyetem Square in Pest, the students may not even notice the monument that decorates the short section of wall between the church and the central building of ELTE. However, it commemorates their predecessors, the heroes who fought for their country in World War I, and those who heroically helped them. The first design of the dramatically collapsing soldier was born in 1928, ninety-five years ago.
A message from the former school: An exhibition in memory of János Neumann was opened at the Fasori Secondary School
An exhibition was opened in János Neumann's former school, the Fasori Lutheran Secondary School, on the occasion of the 120th anniversary of the world-famous mathematician's birth. In the exhibition presenting the former Neumann milieu, paintings, graphics, photos, furniture, and objects tell the story of the art-supporting spirit of the noble bourgeois family at the turn of the century.