green area
This will be the new promenade in Józsefváros
February 2, 2022 at 4:00 PM
The construction of a new pedestrian-friendly promenade in Józsefváros, in the vicinity of the Rákóczi square fairgrounds, is expected to start in the spring. It will give pedestrians more space, build a playground and plant trees. The visual design is complete, we'll show it.
The Pünkösdfürdő Park on the Óbuda dam will be completed soon
December 9, 2021 at 5:00 PM
Trees and shrubs are still being planted, but the playground, the campfire sites and the sports fields have already taken their final place in the Pünkösdfürdő park in Óbuda. The new park, now created on a previously grassy, barren dam site, has been divided into sections with different functions. When designing the area, the goal is to preserve the biodiversity of the place and maintain the ecological balance.
What will Bakáts Square look like?
August 12, 2021 at 4:00 PM
The renovation of Bakáts Square in Ferencváros has been on the agenda for a long time, so we are very curious to see what this cozy area, surrounded by old trees, will look like. According to the district local government, there is no need to wait long for an answer, because the works will be completed by December. The green spaces, pavements and street furniture will be renewed, strengthening the city park function of the square. However, parking will be restricted, car traffic will only be allowed on the longer sides of the square.
A wetland will also be established in the new Csepel Island public park
July 14, 2021 at 6:00 PM
The Budapest Development Center (BFK) has announced a public procurement procedure for the planning of a wetland to be established in the area of the Csepel recreational public park. The idea is that the Wetland, will keep rainwater generated on paved and built-up surfaces of the district along Weiss Manfred Road in place, providing a natural habitat for many plant and animal species.
Educational trail completed in Szép Valley
June 15, 2021 at 3:00 PM
A new educational trail has been completed in the 2nd District Szép Valley forest. Seedlings have been planted in the previously neglected 16-hectare area, and a special birdhouse and forest playground have also been created.
Reconstruction of Normafa car park begins – New greens to replace asphalt
May 7, 2021 at 4:00 PM
On 10 May, one of the most important elements of the renewal of Normafa, the elimination of the old bus stop and car park, will begin writes the website of the 12 District local council. What is now an asphalt area in a protected forest will become a green community area. A car park has been created on Konkoly-Thege Road.
More articles
The Bridge Report, which brought a turning point in the history of Budapest
A travel report that changed the history of Pest and Buda, as well as Hungary. The little book contributed to the change of half a thousand years of legal customs and the implementation of an investment of unprecedented size and technical quality. This book was The Bridge Report [Hídjelentés in Hungarian].
Drama on the university wall - The heroic monument was planned 95 years ago
In the constant hustle and bustle of the Egyetem Square in Pest, the students may not even notice the monument that decorates the short section of wall between the church and the central building of ELTE. However, it commemorates their predecessors, the heroes who fought for their country in World War I, and those who heroically helped them. The first design of the dramatically collapsing soldier was born in 1928, ninety-five years ago.
A message from the former school: An exhibition in memory of János Neumann was opened at the Fasori Secondary School
An exhibition was opened in János Neumann's former school, the Fasori Lutheran Secondary School, on the occasion of the 120th anniversary of the world-famous mathematician's birth. In the exhibition presenting the former Neumann milieu, paintings, graphics, photos, furniture, and objects tell the story of the art-supporting spirit of the noble bourgeois family at the turn of the century.